
Our Tanglewood job was a primary suite: two bathrooms and two closets, remodeled at the same time, with a walk-in steam shower and a stained wood vanity in one room and a green vanity with a freestanding tub in the other.
What We See in Tanglewood Houses
Tanglewood is mid-century ranch stock, most of it fifty to seventy years old, on lots that run about 102 feet wide, with a run of larger two-story houses that filled in later. The houses themselves are sound. It is the floor plans that are forty years behind how a family uses a house now. These are slab houses, and the ground under them moves with no rock beneath it to stop it, so a 1950s slab will take some things and refuse others, and which is which is not obvious from the street.
The Bathrooms Tanglewood Asks Us For
Primary suites are the job we get asked for most in Tanglewood, because the bedroom, the bath, and the closet were drawn as three separate small rooms and the fix is to plan them as one. Standalone primary baths come next, and a refresh makes sense when the layout is already right and only the surfaces have aged.
Pricing
What a Tanglewood Bathroom Costs
Hall or guest bath
$20,000–$55,000
4 to 8 weeks of construction
Primary bath
$63,000–$120,000
8 to 10 weeks of construction
Full primary suite
$75,000–$200,000+
10 to 16 weeks of construction
A full primary suite, bath and closet together, runs $75,000–$200,000+. A primary bath on its own runs $63,000–$120,000. We bill cost-plus with a transparent markup, so you see real costs instead of a padded bid, and you get the number before we start.
4×
Best Home Builder & Remodeler
Fort Worth Magazine, four years running
Small Business of the Year
Fort Worth Chamber of Commerce
Featured in
- Southern Living
- This Old House
- The Dallas Morning News
- Fort Worth Star-Telegram
6th Avenue Homes
Why Tanglewood Homeowners Choose Us
A suite remodel is three rooms that have to be drawn as one, and that is the work our drafting team does before anyone opens a wall. The designer who picks the tile and the crew who set it are on the same payroll, so the plan that leaves the office is the plan that gets built.
FAQ
Bathroom Remodel Questions in Tanglewood
Don't see your question? Ask us at your free consultation.
Schedule a Free ConsultationCan you move a drain in a Tanglewood house?
Usually, and it is routine work. These are slab houses, so relocating a drain means cutting concrete and re-pouring. It gets scoped and priced before construction, not discovered halfway through.
We want the bath and the closet done together. Is that one project?
It is, and it is the one we recommend when the walls are coming down anyway. Doing them together is how the square footage gets reallocated properly instead of the closet inheriting whatever the bath did not use.



