A freestanding tub under a rattan pendant beside a glass shower with nickel-toned fixtures, on a white hex tile floor, in a Riverwood bath refresh

Services

Bathroom Refresh in Fort Worth

New tile, vanity, fixtures, and lighting, with the plumbing left where it is. The fastest way to a bathroom that feels new.

Riverwood

Sometimes the layout is fine. The shower is where it should be, the vanity is the right length, the toilet is out of the way. What's wrong is the beige tile, the oak vanity with the cultured-marble top, the brass-plated faucet, and the bar of bulbs over the mirror.

A refresh replaces the surfaces and the fixtures and leaves the plumbing where it is. New floor and wall tile, a new vanity and top, a new faucet, shower trim, toilet, mirror, sconces, fan, and paint. The drains stay put, so the slab stays closed, and the job stays on the low end of what a bathroom costs.

We treat a refresh like any other job. Our designer walks the selections with you, our drafting team confirms the vanity fits the wall, and our crew does the work.

What's Included

What a Bathroom Refresh Includes

Tile, floor and wallsNew porcelain on the floor and a tile surround or shower wall run to the ceiling, over the same footprint.

Vanity, top, and sinkA new vanity sized to the existing wall, with a stone or quartz top and drawers that close, set on the drains that are already there.

Fixtures and trimFaucet, shower trim, toilet, towel bars, and paper holder in one finish, so the room stops mixing chrome with brass.

Lighting and mirrorSconces at face height or a lit mirror, on a dimmer, replacing the builder bulb bar.

Shower glassA frameless panel or door replacing the framed slider, when the shower is staying where it is.

Ventilation and paintA fan that clears the mirror, ducted outside, and every wall and the ceiling painted before we hand it back.

Cost Range in Fort Worth

$20,000–$55,000

Hall or guest bath, typically 35 to 60 square feet. 4 to 8 weeks of construction.

A new vanity and fresh tile is one project. Moving the shower, relocating plumbing, and bumping out a wall is another. A refresh that keeps everything where it is tends toward the low end of the range. For a hall or guest bath, that range is $20,000–$55,000. The tile, vanity, and fixtures you choose are what move a refresh inside it.

Timeline

4 to 8 weeks of construction

A bathroom whose layout works and whose surfaces don't, in a home where the plumbing has been updated or has never given trouble.

  • Meet Up the free consultation at your house
  • Team Up the Game Plan, the drawings, and the number
  • Glasses Up the build and the walkthrough
Week by week →

4×

Best Home Builder & Remodeler

Fort Worth Magazine, four years running

Small Business of the Year

Fort Worth Chamber of Commerce

Featured in

  • Southern Living
  • This Old House
  • The Dallas Morning News
  • Fort Worth Star-Telegram

Why 6th Avenue Homes

One team for design, permits, and construction.

Every vanity, mirror, and light we order is measured against your wall first. That step goes missing when the designer, the supplier, and the installer are three different companies. Here they work under one roof, so what you picked fits, and a refresh stays a small job.

An oval brass-framed mirror over a gold widespread faucet, a white cone sconce, and a vase of baby's breath on the counter in a Ridglea Hills bath

FAQ

Frequently Asked Questions

Don't see your question? Ask us at your free consultation.

Schedule a Free Consultation
What counts as a refresh, and what turns it into a remodel?

A refresh keeps the shower, toilet, and vanity where they are and replaces what you see and touch. The moment a drain moves, a wall comes out, or the tub becomes a shower, it's a remodel, and we price it as one.

How much does a bathroom refresh cost in Fort Worth?

A refresh sits at the low end of the range for the room: $20,000–$55,000 for a hall or guest bath, $63,000–$120,000 for a primary bath. The tile, the fixtures, and the hardware are where a bath quietly doubles.

Can I keep my tub and just re-tile around it?

If the tub is sound, yes. We check the drain, the overflow, and the subfloor around it before we commit, because a cast-iron tub with a slow drain in a pre-1965 house is often a drain-line problem hiding behind the tile.

How long does a refresh take?

The short end of 4 to 8 weeks of construction. Nothing behind the walls moves, so the schedule is demo, tile, set, grout, fixtures, and paint.

Do you do the design and selections for a job this size?

Yes. A refresh gets the same designer and drafting team as a full remodel. You pick the tile, vanity, fixtures, and lighting with our designer, and we check the vanity length and mirror height against your wall before anything is ordered. You don't get sent to a tile warehouse with a photo and no help.

Does a refresh need a permit?

Often not for surfaces alone, but replacing a shower valve, moving an outlet, or adding a fan circuit can trigger one. We check with the city before we start and pull whatever the scope needs.

Other Services

Where We Build

Bathroom Refreshes in These Cities

Ready to talk about your bathroom?

Tell us about your home. We'll give you an honest picture of what's possible.